Christophe’s Tips

Fine tuning operations maintenance

Annual cleaning with fresh water and Teflon spray

Cradling a very wide boat

Connect 2 equal or different lengths traverse systems with extendable traverse systems

Rallonge-Traverses

Extendable traverse system

Rallonge-traverses

Assembly of two traverse-systems

The traverse systems you have are too short

Rallonge-Traverses

Extendable traverse system

Rallonge-traverses

Assembly of two traverse-systems

Connect 2 equal or different length traverse systems with the extendable traverse system

Move a portable pen board correctly

Use the handling handle to move the pen board and place it adequately under the hull.

For longer trips, use the park wheel.

Poignée de portageDéplacement au PARK ROUE

Transport a ½ cradle with a fork lift

Transport bers

Place a strap on each handle and place traverse system locking pins on each pen board.

Deep V hull or inadequate pad angle

A strap must be placed under the pads, in between each foot in order to take up lateral effort. There is an information pictogram on each pen board.

Unstable boat and tipping forward at the front

Patin-V

Place a pen board with a V hull at the front of the boat.

Very stern heavy boat, crushing the hull behind the keel

Place a pen board under a frame in front of the rudder or transom.

Lifting keel boats

Place a PARKSUP 80 or 100 under the mast frame in order to bear the load and let the keel touch the ground.

Bateau quille relevable - PARKUP EVO 80C + PARKSUP 80 (2)